County Highway P at 1506. The Portage East control point, where the siding (essentially a 3-ish mile double track section) begins, is just over the crossing. |
Date:
4/24/2021 |
Location:
Portage, WI Map ![Show Portage on a rail map](/images/map_us.gif) |
Views:
91 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Andre Wehrle |
Locomotives: |
Author: Andre Wehrle
|
![CP 6302 West, loaded ballast train 8WWA](http://s3.amazonaws.com/rrpa_photos/134541/Trains042421_09-2048.jpg) |
Picture Categories: |
This picture is part of album: Canadian Pacific ex-MILW Mainline 2020-2022 |