In order to activate the crossing gates, the crew has to basically stop at the crossing to run over the detector. Once the gates started the engineer kicked 579 up a couple notches and gave us a little smoke show. From here they would couple back to the rest of the train and head north |
Date:
1/21/2019 |
Location:
Sarasota, FL Map ![Show Sarasota on a rail map](/images/map_us.gif) |
Views:
139 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Cooper Tennerino |
Locomotives: |
Author: Cooper Tennerino
|
![579 kicks it up a couple notches](http://s3.amazonaws.com/rrpa_photos/132931/VideoCapture_20190125-150915.jpg) |
Picture Categories: Roster,Scenic,RollingStock,Track,Action |
This picture is part of album: Seminole Gulf Railway through Sarasota on January 21, 2019 |