A number of piles have been driven into place and the pile driver is at the south end of the bridge. It has to finish this side, then work over the bridge on the other side, which was no accesable to heavy equipment. |
Date:
9/7/2014 |
Location:
Galt, CA Map |
Views:
74 |
Collection Of:
Frederick S. Goethel |
|
Author: Frederick S. Goethel
|
|
Picture Categories: Bridge |
This picture is part of album: Building a new bridge around an existing one |