The second train section is in position, with its end directly under the second footbridge and awaiting the arrival and coupling of the third and last train section. |
Date:
2/10/2013 |
Location:
Saldanha, WC, WC ZA  |
Views:
474 |
Collection Of:

Col André Kritzinger |
|
Author: Col André Kritzinger
|
 |
Picture Categories: Yard |
This picture is part of album: Sishen-Saldanha Iron Ore Export Line (OREX) |