Now that they have the key for the plunger locked points from the signal frame, needed for the points at the far end to run around its train, BL27 is working hard to lift its train |
Date:
10/31/2009 |
Location:
Merrygoen, NSW AU |
Views:
224 |
Collection Of:
David Hardidge |
Locomotives: |
Author: David Hardidge
|
|
Picture Categories: Signal |
This picture is part of album: NSW trip |