After the rail was hauled out of the abandonded siding it was loaded trailers or set aside for later use. Some was taken to High School Crossing. |
Date:
7/25/2009 |
Location:
Ellsworth, ME Map ![Show Ellsworth on a rail map](/images/map_us.gif) |
Views:
160 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
David Larrabee |
|
Author: David Larrabee
|
![Loading Rail](http://s3.amazonaws.com/rrpa_photos/49064/2009%20Summer%20DSRX%20Work%20031.JPG) |
Picture Categories: RollingStock,Yard,Track,Action |
This picture is part of album: Working on the Downeast Scenic RR |